Popular industry event to be held on 11 August
High-profile guests, insightful in-person exchange and a sailing trip on the River Warnow – that neatly sums up Rostock Wind. This year, the wind industry event will be held at the Radisson Blu Hotel in the historic Hanseatic city on 11 August. Attendees can look forward to presentations on technology, financing and planning, together with an attractive fringe programme.
stabilisation package for eno energy GmbH
eno energy GmbH will receive a stabilisation package from the Economic Stabilisation Fund (WSF) of the Federal Republic of Germany in June 2021. The package provides for stabilisation measures of up to 28 million euros.
Invitations to Rostock Wind on 07 August are out!
eno energy invites to “Rostock Wind” again on August 7, 2020 in a larger framework than before. The industry meeting is a center of attraction for connoisseurs, experts and economically and politically interested people of the wind industry. As a regional partner, located in Mecklenburg Westpomerania well as the organizer eno energy, the esteemed colleagues of the Nordex Group will be present for the first time. For the ninth time, the German Wind Energy Association (BWE) and the German Engineering Federation (VDMA) will provide the industry meeting with technical expertise and political weight.
eno energy and Reuther STC deepen their business partnership
eno energy has commissioned the Fürstenwalder Reuther STC GmbH with the delivery of tubular steel towers for four wind towers of the type eno126 wind turbines (WTG).
eno energy systems supplies 3 wind turbines to France
he wind turbine manufacturer eno energy is supplying three eno126 wind turbines with a hub height of 117m for the Noyal-Muzillac wind farm in France.
eno makes studying possible!
The company eno energy was once again honoured for its support of Germany scholarship holders, thus demonstrating its regular support of talented and high-achieving students from the region in order to be able to offer them wide-ranging opportunities for their professional future.
Short-term delivery capability for WTGs within one year
With eno energy’s existing production capacities at the Rostock site, the company promises to deliver ordered wind turbines (WTGs) within ten to 12 months. The delivery time is thus significantly below the current industry average, once again underlining eno’s flexibility and its preference for individual customer solutions as a medium-sized wind energy partner.
Rostock Wind remains the largest onshore wind industry forum in north-east Germany
Interested trade visitors, lively discussions and valuable contacts: Rostock Wind remains the largest onshore wind industry forum in north-eastern Germany.
On 9 August 2019, the eighth Rostock Wind, organised by eno energy, the German Wind Energy Association (BWE) and the German Engineering Federation (VDMA), opened its doors. (VDMA), opened its doors and was once again the meeting place for the wind energy sector.
eno energy GmbH realises 42.2 MW
eno achieves market share of 14.7 per cent
eno energy Group makes a good start to the year in a challenging environment
Higher energy yield from wind farms – launch of “CompactWind II”
Scientists want to optimise flow conditions in wind farms